48-14 54th Avenue , Maspeth, NY, 11378-1311
PIN#84122B0007001R001
Renewal #1. While separate activities are necessary to fulfill the requirements of this contract, which include emergency response for disciplines such as carpentry work, heating and air conditioning, masonry, and other work, the contractor needs to be fully capable of responding immediately and to provide all necessary materials, equipment, and labor to perform the work. This self-reliance could be affected if the contractor has to coordinate the response activity with a subcontractor and therefore subcontracting any work type listed in the contract specification would not be practical here. Therefore, because of these needs and requirements, there are only a few MWBE vendors that have the capability of providing the labor, material, and equipment to perform these types of emergency response needs as a single entity and MWBE participation goal for this contract is 0%.
