PIN#Wharf 2/3 Pier 2 Dock Due:
- EXHIBIT 1 Contract Draft
- EXHIBIT 2 Fee and Cost Schedule
- EXHIBIT 7 Project Schedule
- EXHIBIT 8 DEC USACE Joint App
- BBP P2-3 Wharf and P2 Floating Dock RFP 20241223
- 25_0107 BBP P23 Wharf and Dock Walkthrough Sign In
- P2-3Wharf_P2_Dock RFI Posting_20250110_Addendum 1
- P2-3Wharf_P2_Dock RFP Addendum 2
- EXHIBIT 6A Jacobs Drawings & Specs
Brooklyn Bridge Park seeks to hire a qualified General/Marine Contractor for the rehabilitation of the floating dock at Pier 2 within the Park as well as the wharf between Pier 2 and Pier 3. The Floating Dock, measures 20 ft by 40 ft, and is connected to north side of Pier 2 by a 38-ft long gangway and two guide piles. As part of this scope of work two additional piles are to be installed to stabilize the dock, and repairs to the concrete platform are required. The 275-ft long, 25-ft wide wharf between Piers 2 and 3 requires necessary routine repairs. This includes (12) pile repairs, concrete spall and fascia repairs.
It is important to note that the work scope outlined in this RFP will be taking place in completed sections of the park which are open and populated by the public. Convenience and safety of the public is a priority for BBP.