You are using an UNSUPPORTED version of browser, please try to update your browser.

Title: Correction: General Marine Contractor Services for Pier 2/3 Wharf and Pie r2 Floating Dock Repairs
Procurement
Brooklyn Bridge Park (BBP)
334 Furman Street, Brooklyn, NY 11201
Lindsey Ross
phone: (000) 000-0000
email: proposals@bbp.nyc
Archived
Construction Related Services
Request for Proposals
12/24/2024
Solicitation

PIN#Wharf 2/3 Pier 2 Dock Due:

Description

Brooklyn Bridge Park seeks to hire a qualified General/Marine Contractor for the rehabilitation of the floating dock at Pier 2 within the Park as well as the wharf between Pier 2 and Pier 3. The Floating Dock, measures 20 ft by 40 ft, and is connected to north side of Pier 2 by a 38-ft long gangway and two guide piles. As part of this scope of work two additional piles are to be installed to stabilize the dock, and repairs to the concrete platform are required. The 275-ft long, 25-ft wide wharf between Piers 2 and 3 requires necessary routine repairs. This includes (12) pile repairs, concrete spall and fascia repairs.


It is important to note that the work scope outlined in this RFP will be taking place in completed sections of the park which are open and populated by the public. Convenience and safety of the public is a priority for BBP.


Disclaimer: Pursuant to Section 103 (2) of the New York State General Municipal Law, New York City Charter Section 1066 and the City of New York Procurement Policy Board Rules, The City Record is the official paper of the City of New York. It is published each weekday except legal holidays. The print edition of The City Record is the official publication for the following notices: public hearings, meetings, court notices, property dispositions, procurements (solicitations and awards), agency public hearings, agency rules, and special materials which include changes in personnel. This electronic version of The City Record is offered solely for the convenience of readers.