You are using an UNSUPPORTED version of browser, please try to update your browser.

Title: Design Commission Meeting Agenda, Monday September 16, 2024
Public Hearings and Meetings
Public Design Commission (PDC)
City Hall
City Hall Park
New York, NY 10007
9/16/2024 10:30 AM

Accessibility questions:

Wheelchair Accessible Sign Language Interpretation Large Print Braille Communication Access Real-Time Translation
Archived
9/12/2024
Meeting
Description

Design Commission Meeting Agenda

Monday, September 16, 2024

 

 

Meeting Location: Public Design Commission meetings are being held in-person at the Public Design Commission Board Room on the 3rd floor of City Hall. Members of the public can attend and give testimony either in-person or remotely.

To attend or testify remotely, the public can join the meeting via Zoom at https://cityhall-nyc.zoomgov.com/j/1613608117 or by calling 1 (646) 828 7666 and using the meeting ID: 161 360 8117.

 

Members of the public who wish to give testimony on public hearing items can sign-up in advance using this form: https://tinyurl.com/PDCmeetingform. Instructions for testifying remotely via Zoom or by phone can be found on our website here: https://tinyurl.com/PDC-testimony

 

The meeting will be livestreamed on the Public Design Commission’s YouTube channel at http://www.youtube.com/nycdesigncommission.

 

Public Meeting

10:15 a.m.     Consent Items

 

28903:            Rehabilitation of Walt Whitman Library and adjacent site work, 93 Saint Edwards Street, Brooklyn. (Final) (CC 35, CB 2) BPL

 

28904:            Long-term installation of Sooner or Later (2022) by Mark di Suvero, the Brooklyn Museum, 200 Eastern Parkway, Brooklyn. (Preliminary) (CC 35, CB 9) DCLA

 

28905:            Modifications to the installation of Costume by Ornaghi & Prestinari, Bush Terminal Industrial Campus (Made in NY), between 41st Street, 1st Avenue, and 44th Street, and the waterfront, Brooklyn. (Amended Preliminary) (CC 38, CB 7) DCLA%/EDC

 

28906:            Rehabilitation of Washington Irving Branch Library and adjacent sitework, 360 Irving Avenue, Brooklyn. (Preliminary) (CC 37, CB 4) DDC/BPL

 

28907:            Construction of a recreation center (Shirley Chisholm Recreation Center) and adjacent site work, 3002 Foster Avenue between Nostrand Avenue and New York Avenue, Brooklyn. (Amended Final) (CC 45, CB 17) DDC/DPR

 

28908:            Rehabilitation of the façade, Queens Museum, 52-01 Grand Central Parkway, Flushing Meadows Corona Park, Corona, Queens. (Final) (CC 21, CB 4) DDC/DPR/DCLA

 

28909:            Rehabilitation of the Briarwood Community Library, 85-12 Main Street, Briarwood, Queens. (Final) (CC 24, CB 8) DDC/QPL

 

28910:            Reconstruction of the West Tremont Avenue Bridge over the Major Deegan Expressway, Cedar Avenue, and Roberto Clemente State Park, Bronx. (Final) (CC 16, CB 5) DOT

 

28911:            Design of prototypical pipe bollards for installation citywide. (Amended Final)  DOT

 

28912:            Design of a prototypical automatic public toilet for installation citywide. (Preliminary and Final)  DOT

 

28913:            Installation of the Andrew J. Barberi Ferry commemorative plaque and memorial bell, Ferry Terminal Viaduct south of the St. George Ferry Terminal, Staten Island. (Preliminary and Final) (CC 49, CB 1) DOT

 

28914:            Construction of a storehouse building, Manhattan Storehouse, Bronx Shore Road north of the RFK Bridge, Randall's Island, Manhattan. (Preliminary) (CC 8, CB 11) DPR

 

28915:            Reconstruction of a portion of Maurice A Fitzgerald Playground, 106th Street between 94th Avenue and Atlantic Avenue, Ozone Park, Queens. (Preliminary) (CC 29, CB 9) DPR

 

28916:            Reconstruction of St. Catherine’s Park, adjacent to Manhattan International High School, First Avenue between East 67th Street and East 68th Street, Manhattan. (Preliminary) (CC 5, CB 8) DPR

 

28917:            Reconstruction of a portion of North Rochdale Playground, adjacent to P.S. 30, Baisley Boulevard and Bedell Street, Cambria Heights, Queens. (Final) (CC 28, CB 12) DPR

 

28918:            Reconstruction of Boerum Park, adjacent to P.S. 373, west of Hoyt Street between Warren Street and Baltic Street, Brooklyn. (Final) (CC 39, CB 6) DPR

 

28919:            Reconstruction of D'Emic Playground, adjacent to Sunset Park High School, 3rd Avenue between 34th Street and 35th Street, Brooklyn. (Final) (CC 38, CB 7) DPR

 

28920:            Reconstruction of East Springfield Playground, adjacent to P.S. 147, 115th Road, between 218th Street and 219th Street, Cambria Heights, Queens. (Final) (CC 27, CB 13) DPR

 

28921:            Rehabilitation of Ranaqua, Bronx Park, 1 Bronx River Parkway, Bronx. (Final) (CC 15, CB 6, 7, 11 & 12) DPR

 

28922:            Reconstruction of Midland Playground, adjacent to P.S. 38, Midland Avenue and Lincoln Avenue, between Mason Avenue and Oldfield Street, Staten Island. (Preliminary and Final) (CC 50, CB 2) DPR

 

28923:            Reconstruction of a portion of a pier and floating dock, Hunts Point Riverside Park, Lafayette Avenue and the Bronx River, Bronx. (Preliminary and Final) (CC 17, CB 2) DPR/DOT

 

28924:            Construction of a waterfront park at Pier 6, Bush Terminal Industrial Campus (Made in NY), adjacent to Marginal Way between 41st Street and 43rd Street, Brooklyn. (Preliminary) (CC 38, CB 7) EDC

 

28925:            Reconstruction of a storefront, as part of Phase II of the construction of CityPoint, 445 Albee Square West, Brooklyn. (Final) (CC 33, CB 2) EDC

 

28926:            Construction of Jamaica Station Plaza, Archer Avenue between 146th Street and 147th Place, Jamaica, Queens. (Preliminary) (CC 24, CB 12) EDC/DOT

 

28927:            Construction of façade and entrance improvements, Arthur Ashe Stadium, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Flushing, Queens. (Preliminary) (CC 21, 24, CB 3, 4, 6) DPR/USTA

 

28928:            Construction of a hospitality building (Player Performance Building), including a parking garage, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Flushing, Queens. (Preliminary) (CC 21, 24, CB 3, 4 & 6) DPR/USTA

 

28929:            Rehabilitation of Columbus Park Pavilion, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan. (Preliminary) (CC 1, CB 3) DPR

 

28930:            Reconstruction of Gwen Ifill Park, 129th Avenue, 176th Street, and 133rd Avenue, Jamaica, Queens. (Preliminary) (CC 27, CB 12) DPR

 

28931:            Reconstruction of the shoreline, as Phase I of the restoration of the Lakeshore shoreline, Parkside Avenue, between Parade Place and Ocean Avenue, adjacent to East Drive, Prospect Park, Brooklyn. (Preliminary) (CC 39, CB 6, 7, 8, 9 & 14) DPR/PPA

 

28939:            Rehabilitation of a façade and replacement of a roof, Pamoja House, 357 Marcus Garvey Boulevard, Brooklyn. (Preliminary and Final) (CC 36, CB 3) DDC/DHS

 

28940:            Minor modifications to the installation of an interim sallyport, bail payment center, and adjacent planted area, Queens Criminal Court, 125-01 Queens Boulevard at 82nd Avenue, Kew Gardens, Queens. (Amended Final) (CC 29, CB 9) DDC/DOC

 

28941:            Reconstruction of a step street, including the construction of ADA ramps, Henwood Place between Walton Avenue and Morris Avenue, Bronx. (Final) (CC 14, CB 5) DDC/DOT

 

28942:            Minor modifications to the construction of a sanitation garage, Districts 1 & 3, Freshkills Park, Muldoon Avenue and West Service Road, Staten Island. (Amended Final) (CC 51, CB 3) DDC/DSNY

 

28943:            Installation of an ADA ramp and stairs, Wakefield Library, 4100 Lowerre Place, Bronx. (Final) (CC 11, CB 12) DDC/NYPL

 

28944:            Installation of security bollards, Young Israel of Hillcrest, 169-07 Jewel Avenue, Fresh Meadows, Queens. (Preliminary and Final) (CC 24, CB 8) DOT

 

28945:            Removal of a distinctive sidewalk, Chase Bank, 75 East 161st Street, Bronx. (Preliminary and Final) (CC 16, CB 4) DOT

 

28946:            Installation of Al Qalam: Poets in the Park by Sara Ouhaddou, Elizabeth H. Berger Plaza, Greenwich Street, Edgar Street, Trinity Place, and Morris Street, Manhattan. (Preliminary) (CC 1, CB 1) DPR

 

28947:            Reconstruction of a roof and rehabilitation of the façade, Pelham Fritz Recreation Center, Marcus Garvey Park, 120th Street, Madison Avenue, 124th Street and Mount Morris Park West, Manhattan. (Preliminary) (CC 9, CB 11) DPR

 

28948:            Construction of a storehouse building, Manhattan Storehouse, Bronx Shore Road north of the RFK Bridge, Randall's Island, Manhattan. (Final) (CC 8, CB 11) DPR

 

28949:            Reconstruction of a tot lot, Mahoney Playground, Beechwood Avenue and Cleveland Street, Staten Island. (Final) (CC 49, CB 1) DPR

 

28950:            Reconstruction of Dyckman Marina and adjacent site work, Fort Washington Park Greenway and Route 9A at Dyckman Street, Inwood Hill Park, Manhattan. (Final) (CC 10, CB 12) DPR

 

28951:            Design of a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens. (Final) (CC 21, CB 7) EDC

 

28952:            Minor modifications to the installation of electric vehicle charging stations, Pier 36 (Basketball City), 299 South Street, Manhattan. (Amended Final) (CC 1, CB 3) EDC

 

28953:            Minor modifications to the landscape as part of the construction of Buildings 2A and 2B and a central plaza, as Phase II of the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx. (Amended Final) (CC 17, CB 2) EDC

 

28954:            Minor modifications to a retaining wall as part of the construction of a maintenance building, a comfort station, and adjacent site work, as Phase II and Phase III of the construction of a waterfront park and streetscape improvements, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island. (Amended Final) (CC 49, CB 1) EDC/DPR

 

28955:            Installation of a façade and renovation of Emergency Medical Service (EMS 58), 420 East 83rd Street, Brooklyn. (Final) (CC 42, CB 18) FDNY

 

 

                        Public Hearing

10:20 a.m.

28956:            Construction of a water recirculation system, including adjacent site work, south of Central Park North between Adam Clayton Powell Jr. Boulevard and Malcolm X Boulevard, between the Harlem Meer and Fifth Avenue near East 106th Street, and east of Central Park West between West 100th Street and the Pool, Central Park, Manhattan. (Preliminary) (CC 3, 4, 5, 6, 7, 8 & 9, CB 5, 7, 8, 10 & 11) DPR/CPC

 

                        https://www.nyc.gov/assets/designcommission/downloads/pdf/09-16-2024-pres-DPR-CPC-p-NorthEndCirculation.pdf

 

11:00 a.m.

28957:            Reconstruction of the Northwest shoreline as Phase 1 of the reconstruction of the Harlem Meer shoreline, Central Park North between the East Drive and Fifth Avenue, Central Park, Manhattan. (Preliminary and Final) (CC 3, 4, 5, 6, 7, 8 & 9, CB 5, 7, 8, 10 & 11) DPR/CPC

 

                        https://www.nyc.gov/assets/designcommission/downloads/pdf/09-16-2024-pres-DPR-CPC-pf-HarlemMeerPh1.pdf

 

11:40 a.m.

28958:            Construction of an addition, Rosedale Community Library, 144-20 243rd Street, Rosedale, Queens. (Preliminary) (CC 31, CB 13) DDC/QPL

                       

https://www.nyc.gov/assets/designcommission/downloads/pdf/09-16-2024-pres-DDC-RosedaleCommunityLibrary.pdf

 

All times are approximate and subject to change without notice, and those who are testifying remotely should follow along on the livestreamed meeting on the Design Commission’s YouTube channel to know when to join the meeting. If testifying at City Hall, please plan to arrive early in the event the meeting is ahead of schedule. Details on giving public testimony can be found here: https://www.nyc.gov/site/designcommission/review/public-testimony.page

 

Items on the consent agenda are not presented. If you wish to testify regarding a design-related issue of a project on the consent agenda, please notify staff as soon as possible.

 

Do you need assistance to participate in the meeting? If you need a reasonable accommodation of a disability, such as translation into a language other than English; American Sign Language Interpreting (ASL); Captioning in Real-Time (CART); or the meeting agenda in Braille, large print, or electronic format, please contact the Public Design Commission at least three business days before the meeting.

 

Public Design Commission
City Hall, Third Floor
Phone: 212-788-3071
Fax: 212-788-3086

www.nyc.gov/designcommission

designcommission@cityhall.nyc.gov


Disclaimer: Pursuant to Section 103 (2) of the New York State General Municipal Law, New York City Charter Section 1066 and the City of New York Procurement Policy Board Rules, The City Record is the official paper of the City of New York. It is published each weekday except legal holidays. The print edition of The City Record is the official publication for the following notices: public hearings, meetings, court notices, property dispositions, procurements (solicitations and awards), agency public hearings, agency rules, and special materials which include changes in personnel. This electronic version of The City Record is offered solely for the convenience of readers.