7 Carey Place , Port Washington, NY, 11050
PIN#85023B0073001
Except for procurements for construction, a procurement using a PQL shall be considered a "special case" under these Rules.
This Project will provide a new voice evacuation fire alarm system with post-fire smoke purge controls, fire department in-building auxiliary radio communication system (ARCS), fire/smoke dampers and smoke dampers to replace the existing system and dampers in full compliance with the 2014 New York City Building Code. The existing fire alarm system will remain operational during construction and only be disabled and removed after the new system is installed, tested, approved by FDNY, and made fully operational. General Construction scope includes the following: 1) removal and reinstallation of finishes after completion of fire alarm work, 2) patch, repair and paint walls, 3) providing new fire rated access doors, 4) removal and reinstallation of ceiling for mechanical scope associated with fire/smoke damper replacements, 5) renovation of existing closets to provide new 2-hour fire rated closets for fire alarm equipment, 6) providing fire rated doors at new fire alarm closets, 7) firestopping pass-through conduit penetrations, 8) flashing to waterproof conduit penetrations to the roof, 9) providing new signage at new fire alarm closets, 10) construction of temporary walls for fire alarm device mounting by two stair doors from 1st to 4th Floor, 11) construction of concrete pad for power transformer, 12) providing new pedestals for installation of pull station at main entrance.
Community Board: Queens 12