124 GRANITE AVE , STATEN ISLAND, NY, 10303
PIN#82624B0007001
The scope of work under this Contract is to provide the necessary labor, materials, and equipment to upgrade two (2) centrifuge control panels and one (1) pump interface panel in the Dewatering Building (the “Work”) at the Red Hook Water Resource Recovery Facility (WRRF) (the “Site”). The Work includes, but is not limited to, to the disconnection and removal of the two (2) existing centrifuge control panels and the one (1) pump interface panel including wire and conduit and furnish and install two (2) new centrifuge control panels, one (1) pump interface panel, wire and conduit.
