PIN#Synthetic Turf Due:
The Brooklyn Bridge Park Corporation is seeking an experienced contractor to perform the replacement of synthetic turf located at Pier 2 within the park. The scope of work for this project requires the contractor to remove and dispose of the existing synthetic turf, remove the existing shock pad for reuse, level the existing stone base to specified planarity, reinstall existing shock pad, supply and install new synthetic turf.
Pier 2 is dedicated to hosting year-round active recreation by providing a variety of athletic courts and attractions. There is active pedestrian traffic 7 days a week and the contractor will be required to coordinate with the park to optimize pedestrian access to both the promenade and neighboring activities for the duration of the project.