338 E 95th Street , New York, NY, 10128-5703
PIN#82623B0027001
BWT-WI-318 (R): The scope of work under this Contract is to provide the necessary labor, materials, and equipment to install new resistor banks for the main sewage pumps (MSPs) #2 and #6 and install new secondary contactors for all six MSPs (the “Work”) at the Wards Island Wastewater Resource Recovery Facility (the “Site”). The Work includes, but is not limited to, asbestos abatement for the existing resistor banks #2 and #6, and disposal of the existing resistor banks #2 and #6. Asbestos abatement and disposal of the existing secondary contactors for MSPs #1 through #6 shall also be required.
