phone: (212) 306-4535
email: Genara.Pedroso@nycha.nyc.gov
PIN#435018 SMD_SERVICES_Requirements Contract for Replacement of Motorized Steam Control Zone Valve Stations & Heating Control Panels Citywide with Bronx Borough Focus
PIN#435019 SMD_SERVICES_Requirements Contract for Replacement of Motorized Steam Control Zone Valve Stations & Heating Control Panels Citywide with Brroklyn Borough Focus
PIN#435020 SMD_SERVICES_Requirements Contract for Replacement of Motorized Steam Control Zone Valve Stations & Heating Control Panels Citywide with Manhattan Borough Focus
PIN#435021 SMD_SERVICES_Requirements Contract for Replacement of Motorized Steam Control Zone Valve Stations & Heating Control Panels Citywide with Queens/SI Borough Focus
SCOPE OF WORK
1. Remove all control wiring from the motorized steam control valve to the terminal box in the tank room. 2. Disconnect the pressure and compound gauges’ connection from zone valve station. 3. Remove existing steam control zone valve stations including motorized steam control valves, all gate valves, by pass valves, strainers and all associated piping. 4. All valves removed not claimed by NYCHA shall become contractor’s properties and shall be legally disposed. 5. Reconnect the existing pressure and compound gauges to the new steam control zone valve station. 6. Provide new adequate control wiring with conduit from the new motorized steam control valve to the existing terminal box in the tank room. New control cables shall be as specified in Sec. C of the SOW. In the opinions of NYCHA that existing control cables could be reused, NYCHA will give contractor the directions. 7. Test the equipment in all modes of operation. 8. Check piping for leaks. 9. Calibrate new motorized steam control valves to agree with settings as indicated on the heating control panel. 10. Replace heating control panel. The new heating control panel shall be the same model as the one removed or as directed by NYCHA. 11. Reconnect all existing control wiring and electrical wiring to new panels for the proper operation. 12. Install new steam control zone valve stations as per manufacturer’s recommendation and best trade practice.
Please Note : This Contract shall be subject to the New York City Housing Authority's Project Labor Agreement and, as part of its bid, the Bidder must submit at time of bid submission: (1) a Letter of Assent to the Project Labor Agreement signed by the Bidder, and (2) Letters of Assent signed by each of the Bidder's proposed Subcontractors.
A non-mandatory virtual Pre-bid Conference will be held on Thursday May 25, 2023 @ 11:00 AM, and will be conducted remotely via Microsoft Teams meeting. Although attendance is not mandatory at the Pre-Bid Conference, it is strongly recommended that all interested Bidders attend and that Bidders thoroughly review bid documents in advance of the meeting. To participate in the Pre-Bid Conference, please follow the instructions below:
Microsoft Teams meeting Join on your computer or mobile app
Option 1: Copy and paste the below into your browser https://teams.microsoft.com/l/meetup-join/19%3ameeting_NmIyZDdlNTctY2Y3NS00NDRjLWJmNjYtMThhOTg4ZmM1ZjA1%40thread.v2/0?context=%7b%22Tid%22%3a%22709ab558-a73c-4f8f-98ad-20bb096cd0f8%22%2c%22Oid%22%3a%22e30aab87-a08f-452b-9e77-47008188e541%22%7d
Option 2: Meeting ID: 264 686 787 998 Passcode: A8tb2v Download Teams | Join on the web
Option 3: call in (audio only) +1 646-838-1534,,394289635# United States, New York City Phone Conference ID: 394 289 635#
RFQ Question Submission Deadline 5/31/23 at 2:00PM
Question and Answer Release Date 6/6/23 at 2:00PM