PIN#82623B0027 Due:
Mandatory: no
Date/Time - 2023-01-30 10:00:00
BWT-WI-318 (R): The scope of work under this Contract is to provide the necessary labor, materials, and equipment to install new resistor banks for the main sewage pumps (MSPs) #2 and #6 and install new secondary contactors for all six MSPs (the “Work”) at the Wards Island Wastewater Resource Recovery Facility (the “Site”). The Work includes, but is not limited to, asbestos abatement for the existing resistor banks #2 and #6, and disposal of the existing resistor banks #2 and #6. Asbestos abatement and disposal of the existing secondary contactors for MSPs #1 through #6 shall also be required. This Competitive Sealed Bid (“RFx”) is being released through PASSPort, New York City’s online procurement portal. Responses to this RFx should be submitted via PASSPort. To access the solicitation, vendors should visit the PASSPort Public Portal at https://www1.nyc.gov/site/mocs/systems/about-go-to-passport.page and click on the “Search Funding Opportunities in PASSPort” blue box. This will take you to the Public Portal of all procurements in the PASSPort system. To quickly locate the RFx, insert the EPIN 82623B0027 into the Keywords search field. If you need assistance submitting a response, please contact help@mocs.nyc.gov. On the Response Due Date at 10AM, please be advised that you will be required to submit a PAPER copy of the Bid Submission Form and the Bid Security to NYC Department of Environmental Protection, 96-05 Horace Harding Expressway, 1st Floor Low Rise, Flushing, NY 11373