phone: (212) 306-3609
email: erneste.pierre-louis@nycha.nyc.gov
PIN#409990 WASHINGTON HOUSES
PIN#409991 RICHMOND TERRACE
PIN#409992 WOODSIDE
PIN#409993 POLO GROUNDS
PIN#409994 HOWARD
PIN#409995 LINCOLN
PIN#409996 VANDALIA
PIN#409997 WOODSON
PIN#409998 CLAREMONT
PIN#409999 MARBLE HILL
PIN#410000 TAYLOR WYTHE
PIN#410001 UNITY PLAZA
PIN#410003 REDFERN
The work shall consist of furnishing all labor, materials, equipment and all other incidental items necessary and required to perform the subject work as follows: Installation of vinyl-composition floor tile over existing floor tile. Installation of vinyl-composition floor tile over the existing properly prepared concrete floor. The removal and replacement of existing/or missing vinyl cove base molding (See Section VIII). As directed, remove Non-Asbestos Containing floor coverings, including but not limited to vinyl composition floor tile, linoleum, self-adhesive floor tile, carpet, ceramic floor tile, wood flooring, etc.