75 East Bethpage Road , Plainview, NY, 11803
PIN#82621B0039001
The Borden Avenue Pump Station was built in the 1950’s and last upgraded in the 1980’s. It is in need of an immediate upgrade as BWT is having difficulty obtaining replacement parts for its antiquated equipment. As part of this project, the Pumping Station will be physically expanded with replacement of all equipment and conversion of the existing dry well to wet well. To the extent possible, the project is designed to prepare the Pumping Station for future expansion. SCADA and resiliency upgrades are made to accommodate the current needs of the Pumping Station as well as provide for the future expansion.
