phone: (000) 000-0000
email: arios@bbp.nyc
PIN#EFF Dumbo WF Due:
- BBP EMPIRE FULTON FERRY AND DUMBO WATERFRONT PROJECT_RFP
- EXHIBIT 1 CONTRACT DRAFT
- EXHIBIT 2 PROPOSAL FORM AND FEE AND COST SCHEDULES
- EXHIBIT 6 JACOBS BID DRAWINGS AND SPECIFICATIONS
- • EXHIBIT 6_A_EFF Revetment Design Permit Figures
- • EXHIBIT 6_B_Dumbo Waterfront - Issued For Bid Specifications
- • EXHIBIT 6_C_ SPECS_02 41 00 – Demolition
- • EXHIBIT 6_D_31 37 00 – Revetment
- • EXHIBIT 6_E_31 23 00 - Excavating, Filling, and Backfilling
- • EXHIBIT 6_F_35 10 00 - Turbidity Curtain
- • EXHIBIT 6_G_31 35 00 - Geotextile
- EXHIBIT 7 BBP SITE MAP
- BBP Empire Fulton Ferry_Dumbo Waterfront Project_Walkthrough_sign_in
- BBP_BBP Empire Fulton Ferry_Dumbo Waterfront Project_Addendum 1
- EXHIBIT 2 PROPOSAL FORM AND FEE AND COST SCHEDULES_RV1
- EXHIBIT 6_A1_EFF Revetment Design _IFB Drawings
- EXHIBIT 6_A2_EFF Revetment Design _IFB Specifications
- BBP_BBP Empire Fulton Ferry_Dumbo Waterfront Project_Addendum 2
- EXHIBIT 6 JACOBS BID DRAWINGS AND SPECIFICATIONS_Rev 1
- EXHIBIT 6_B_Dumbo Waterfront - Issued For Bid Specifications_Rev 1
Empire Fulton Ferry Rip-Rap Revetment The Empire Fulton Ferry (EFF) revetment is located within Brooklyn Bridge Park between Main Street and Old Dock Street. The revetment requires reconstruction to address erosion and settlement issues currently exhibited along the existing riprap revetment. The project will replace the existing riprap revetment along approximately 490 linear feet of shoreline with a similar riprap structure.
Dumbo Waterfront Encompasses approximately 1,800 linear feet of shoreline inclusive of Main Street park Shoreline, Adams Street Bulkhead, John Street Park Shoreline, and Jay Street Bulkhead and Connector. The scope of repairs includes the following:
o Main Street Shoreline – Clean and reattach trash rack at an existing outfall, replace missing armor stone
o John Street Shoreline – Replace missing armor stone
o Jay Street Bulkhead – Surface concrete spall and erosion repairs
o Adam Street Bulkhead – Concrete extension of bulkhead
Adam’s Street Esplanade Pavement Settling - This project will investigate the cause of settlement and fill loss observed in the area and will include the reconstruction of subgrade stability by way of pressured grout injections.
EMPIRE FULTON FERRY AND DUMBO WATERFRONT PROJECT
BBP EMPIRE FULTON FERRY AND DUMBO WATERFRONT PROJECT_RFP
EXHIBIT 1 CONTRACT DRAFT
EXHIBIT 2 PROPOSAL FORM AND FEE AND COST SCHEDULES
EXHIBIT 3 M/WBE UTILIZATION PLAN FORM (included in RFP)
EXHIBIT 4 DOING BUSINESS DATA FORM (included in RFP)
EXHIBIT 5 PASSPORT (included in RFP)
EXHIBIT 6 JACOBS BID DRAWINGS AND SPECIFICATIONS
• EXHIBIT 6_A_EFF Revetment Design Permit Figures
• EXHIBIT 6_B_Dumbo Waterfront - Issued For Bid Specifications
• EXHIBIT 6_C_ SPECS_02 41 00 – Demolition
• EXHIBIT 6_D_31 37 00 – Revetment
• EXHIBIT 6_E_31 23 00 - Excavating, Filling, and Backfilling
• EXHIBIT 6_F_35 10 00 - Turbidity Curtain • EXHIBIT 6_G_31 35 00 - Geotextile
EXHIBIT 7 BBP SITE MAP