phone: (718) 650-5931
email: lross@bbp.nyc
PIN# 334118 Due:
- EXHIBIT 1 Contract Draft
- EXHIBIT 2_Cost Schedule
- EXHIBIT 6A_E2PM Bid Docs
- EXHIBIT 6B_ASW Bid Docs
- EXHIBIT 6C_Bid Doc Specifications
- EXHIBIT 7_Parkwide Map
- Addendum 1 BB Plaza Walkthrough
- Addendum 2 BB Plaza ASW Bid Doc
- BBP Pier 6 NW Corner RFP 20210823_Final
- Contractor Site Walkthrough 08_27_21_Sign_in
- P6NW_Addendum 3 BB Plaza_EXHIBIT 2_Cost Schedule
- EXHIBIT 2_Cost Schedule_RVI
- P6NW_Addendum 4 BB Plaza_RFI Responses
- P6NW_Addendum 5 BB Plaza_AKRF_Pier_6_Lead_Report
Brooklyn Bridge Park is an eighty-five (85) acre waterfront park in Brooklyn, NY, which requires regular restoration work to various sections of the park. The Pier 6 Northwest Corner Restoration project is intended to revive the unprogrammed Northwest corner of Pier 6.
Pier 6 is the southernmost pier of BBP, and is located between Bridge Park Drive and Atlantic Avenue. The restoration includes spall repairs of concrete walls and curb, selective demolition, lead abatement and repainting, lighting and electrical, and earthworks. BBP has also included add-alternates for additional electrical scope, and installation of bench seating
Note that the work outlined in this RFP will be accessed via open sections of the park populated by the public. While this section of the Pier will be closed to the public during construction, site access from the street will run across BBP’s open Greenway.