phone: (212) 306-4718
email: miriam.rodgers@nycha.nyc.gov
PIN#68519-3 NDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT FOR GAS PIPING RESTORATION, ASBESTOS INVESTIGATION, AIR MONITORING AND ASBESTOS ABATEMENT
PIN#68520-3 NDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT FOR GAS PIPING RESTORATION, ASBESTOS INVESTIGATION, AIR MONITORING AND ASBESTOS ABATEMENT
PIN#68521-3 NDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT FOR GAS PIPING RESTORATION, ASBESTOS INVESTIGATION, AIR MONITORING AND ASBESTOS ABATEMENT
PIN#68522-3 NDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT FOR GAS PIPING RESTORATION, ASBESTOS INVESTIGATION, AIR MONITORING AND ASBESTOS ABATEMENT
PIN#68523-3 NDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT FOR GAS PIPING RESTORATION, ASBESTOS INVESTIGATION, AIR MONITORING AND ASBESTOS ABATEMENT
PIN#68527-3 NDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT FOR GAS PIPING RESTORATION, ASBESTOS INVESTIGATION, AIR MONITORING AND ASBESTOS ABATEMENT
This Contract shall be subject to the New York City Housing Authority’s Project Labor Agreement and, as part of its bid, the Bidder must submit (1) a Letter of Assent to the Project Labor Agreement signed by the Bidder and (2) Letters of Assent signed by each of the Bidder’s proposed Subcontractors. Bidders are referred to Section 5 of the Contract’s Special Notices and Conditions setting forth the requirements for submission of the Bidder’s signed Letter of Assent and the Letters of Assent signed by each of the Bidder’s proposed Subcontractors.
The scope of work under this contract is to restore gas services by replacing existing underground gas distribution piping between buildings up to and including building shutoff valve and includes but not limited to the following:Core boring and drilling; Removal and installation of piping, fittings and valves; Stove hook-up; Fire stopping; Inspections; Plastering and sheet rock removal and restoration; Landscaping where necessary; Permit filings; Registration with applicable utility companies; Provide all required; excavations, including hand excavation; Concrete and pavement cuttings; Shoring, trenching and back fill; Supports for excavated pipes and conduits. All other lines that may exist underground for the underground gas service piping replacement (if it is required to be replaced by utility company) from the property line to the point of entry (POE) of the building. Coordinate the point of entry (POE) for the building with the utility company. The excavation, back-filling and shoring should be in accordance with the requirement of the serving utility company, NYC buildings code and gas fuel; Perform Asbestos Investigation and Abatement as required including all necessary Regulatory filings (Refer to SOW in Appendix A and B); Provide Independent 3rd Party Air Monitoring for abatement work.