phone: (917) 613-7584
email: lross@bbp.nyc
PIN#334116 Due:
- BBP BK Bridge Plaza Reconstruction RFP 20200708_Final
- EXHIBIT 1_ 20_0708 BB Plaza DRAFT Contract
- EXHIBIT 6B_MVVA 50% Bid Docs Specs
- EXHIBIT 7A_Parkwide Map
- EXHIBIT 7B_Site Utility Survey
- EXHIBIT 8_ Brooklyn Tower Base - DOT Site Logistics
- EXHIBIT 9_2020.06.25_Pricing_Breakout
- EXHIBIT 2_BBP Plaza - RFP Pricing Exhibit Final
- EXHIBIT 6A_MVVA 50 Bid Docs Dwgs_Part 1
- EXHIBIT 6A_MVVA 50 Bid Docs Dwgs_Part 2
- BK Bridge Plaza RFP Addendum 1
- Contractor Walk Thru Sign-in sheet
- Addendum 2 BB Plaza
- Addendum 3 BB Plaza
The Plaza project largely compromises of new pavers and asphalt; along with the addition of planting beds designed throughout to enhance Park circulation and visual connections to the Brooklyn Bridge and Manhattan skyline. The proposed paving design includes new cobles, asphalt, concrete sidewalk, and concrete pavers. This scope will also upgrade some of the existing asphalt and chip & seal throughout the project area. The proposed planting beds will be added to the area under the Brooklyn Bridge, and include an upgrade to the Empire Fulton Ferry Lawn. Site furnishings such as seating will be added to the Empire Fulton Ferry Lawn, along with additional light poles distributed throughout. The addition of security bollards will run the length of the project area from Water Street and Old Dock to Furman and Old Fulton Streets. Scope also includes Park infrastructure upgrades, including civil, plumbing, and electrical units in the Plaza area.
