You are using an UNSUPPORTED version of browser, please try to update your browser.

Title: Design Commission Meeting Agenda, Tuesday, January 22, 2019
Public Hearings and Meetings
Public Design Commission (PDC)
1/22/2019

Accessibility questions:

Wheelchair Accessible Sign Language Interpretation
Archived
1/17/2019
Meeting
Description

Meeting Agenda

Tuesday, January 22, 2019

 

 

The Committee Meeting is scheduled to begin at 10:50 a.m.

Public Meeting

 

12:00 p.m.      Consent Items

 

26891:             Design of a tenant signage system, Admiral's Row Plaza, Navy Street, Flushing Avenue, Fourth Street, and Gate Street, Brooklyn Navy Yard Industrial Park, Brooklyn. (Preliminary and Final) (CC 33, CB 2) BNYDC

 

26892:             Installation of a prototypical newsstand, 303 East 83rd Street, northeast corner of Second Avenue and East 83rd Street, Manhattan. (Preliminary and Final) (CC 5, CB 8) DCA/DOT

 

26893:             Rehabilitation of the pier over John Finley Walk, Brearley School, 610 East 83rd Street, Manhattan. (Preliminary) (CC 5, CB 8) DCAS/DPR/DOT

 

26894:             Reconstruction of a plaza and adjacent site work, Queens Borough Hall, 120-55 Queens Boulevard, Kew Gardens, Queens. (Final) (CC 29, CB 9) DDC

 

26895:             Installation of rooftop mechanical equipment, Museum of Modern Art PS1, 22-25 Jackson Avenue (P.S. 1 Contemporary Art Center, 46-01 21st Street), Long Island City, Queens. (Preliminary and Final) (CC 26, CB 2) DDC/DCLA

 

26896:             Installation of security infrastructure, including bollards and planters, Rockefeller Center, Fifth Avenue between West 48th Street and West 51st Street, Manhattan. (Final) (CC 4, CB 5) DDC/DOT

 

26897:             Installation of streetscape improvements, Beach 108th Street between Beach Channel Drive and Shore Front Parkway, Rockaway Park, Queens. (Preliminary) (CC 32, CB 14) DDC/DPR/DOT

 

26898:             Installation of a fuel tank access hatch and ventilation equipment, Engine Company 209/Ladder Company 102, 850 Bedford Avenue, Brooklyn. (Preliminary and Final) (CC 33, CB 3) DDC/FDNY

 

26899:             Installation of sewer access hatches, 114th Police Precinct, 34-16 Astoria Boulevard, Long Island City, Queens. (Preliminary and Final) (CC 22, CB 1) DDC/NYPD

 

26900:             Construction of anaerobic digester tanks, a pumping station, and adjacent site work, Hunts Point Water Pollution Control Plant, Viele Avenue, Manida Street, Ryawa Avenue, and Barretto Street, Bronx. (Preliminary) (CC 17, CB 2) DEP

 

26901:             Installation of commemorative plaques and a flagpole, 239th Street median at Hillside Avenue, Bellerose, Queens. (Preliminary) (CC 23, CB 13) DOT

 

26902:             Construction of an ADA ramp and stairs, 37 West 93rd Street, Manhattan. (Final) (CC 6, CB 7) DOT

 

26903:             Construction of athletic courts and an adult fitness area, Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria, Queens. (Preliminary) (CC 22, CB 1) DPR

 

26904:             Construction of a kayak launch, installation of a storage container, and reconstruction of the shoreline, Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria, Queens. (Final) (CC 22, CB 1) DPR/EDC

 

26905:             Reconstruction of the playground, White Park, Lyman Avenue, Summer Street, High Street, and Bay Street, Staten Island. (Preliminary) (CC 50, CB 1)  DPR

 

26906:             Reconstruction of the World's Fair Marina, Flushing Bay Promenade, Flushing Meadows Corona Park, Corona, Queens. (Preliminary) (CC 21, CB 3) DPR

 

26907:             Rehabilitation of a comfort station, Prall Playground, Elizabeth Street, Forest Avenue, Clove Lake Place, and Broadway, Staten Island. (Preliminary) (CC 49, CB 1) DPR

 

26908:             Conservation and Relocation of the Highbridge Doughboy (1923) from the triangle park between Boscobel Place, Ogden, and Boscobel Avenues to Macombs Dam Park, Jerome Avenue and 161st Street, Bronx. (Final) (CC 8, CB 4) DPR

 

26909:             Conservation of the Dover Patrol Monument, John Paul Jones Park, Fourth Avenue and 101st Street, Brooklyn. (Final) (CC 43, CB 10) DPR

 

26910:             Construction of a dog run, Devoe Park, Sedgwick Avenue and West Fordham Road, Bronx. (Final) (CC 14, CB 7) DPR

 

26911:             Reconstruction of Harlem Lane Park and Frederick Johnson Park, Adam Clayton Powell Jr. Boulevard, West 150th Street, and Harlem River Drive, Manhattan. (Final) (CC 9, CB 10) DPR

 

26912:             Reconstruction of Ravenswood Playground, 35th Avenue, 21st Street, and 34th Avenue, Astoria, Queens. (Final) (CC 26, CB 1) DPR

 

26913:             Reconstruction of track 1, soccer fields 3, 4 & 5, and ballfields 1-4 as Phase III of the reconstruction of the Red Hook Recreation Area, Columbia Street and Bay Street, Brooklyn. (Final) (CC 38, CB 6) DPR

 

26914:             Rehabilitation of a comfort station, Grove Hill Playground, adjacent to P.S. 157, East 158th Street between Eagle Avenue and Cauldwell Avenue, Bronx. (Final) (CC 17, CB 1) DPR

 

26915:             Reconstruction of column foundations (Summer Stage) Rumsey Playfield, 72nd Street and East Drive, Central Park, Manhattan. (Final) (CC 6, CB 5, 7 & 8) DPR/CPC

 

26916:             Construction of an ADA ramp, East 82nd Street and John Finley Walk, Manhattan. (Preliminary) (CC 5, CB 8) DPR/DOT

 

26917:             Reconstruction of a pedestrian path and ADA improvements, Carl Schurz Park, East End Avenue between East 84th Street and East 86th Street, Manhattan. (Preliminary and Final) (CC 5, CB 8) DPR/EDC/DOT

 

26918:             Reconstruction of baseball fields 2 and 3 and adjacent site work, the Long Meadow and the Upper Pool, Prospect Park West and Prospect Park Southwest, Prospect Park, Brooklyn. (Preliminary) (CC 39, CB 6, 7, 8, 9, 12, & 14) DPR/PPA

 

26919:             Installation of signage, West Thames Pedestrian Bridge over Route 9A, West Street between West Thames Street and Joseph P. Ward Street, Manhattan. (Preliminary and Final) (CC 1, CB1) EDC/DOT

 

26920:             Construction of Site B as part of reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn. (Preliminary) (CC 47, CB 13) EDC/DPR

 

26921:             Construction of Site D as part of reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn. (Final) (CC 47, CB 13) EDC/DPR

 

26922:             Construction of Parachute Way Plaza, including the installation of an artwork by Xenobia Bailey and the relocation of the Jackie Robinson and Pee Wee Reese Memorial (2005) by William Behrends, between Surf Avenue and the boardwalk, as part of the Coney Island Infrastructure Project, Brooklyn. (Final) (CC 47, CB 13) EDC/DPR/DCLA%

 

26923:             Installation of Prism Arbor by Xenobia Bailey, Parachute Way Plaza between Surf Avenue and the Riegelmann Boardwalk, Brooklyn. (Preliminary) (CC 47, CB 13) DCLA%/EDC/DPR

 

26924:             Construction of Hudson Park and Boulevard, a portion of Phase IIA, 10th Avenue and 11th Avenue from 36th Street to 37th Street, Manhattan. (Final) (CC 3, CB 4) EDC/DPR/DOT

 

 

Design Commission meetings are held in the conference room on the third floor of City Hall, unless otherwise indicated.

 

All attendees, including members of the public, are encouraged to arrive at least 45 minutes in advance of the estimated time; those who also plan to testify are encouraged to submit their testimony in writing in advance of the meeting date. Please note that all times are approximate and subject to change without notice.

              

Please note that items on the consent agenda are not presented. If members of the public wish to testify on a consent agenda item, they should contact the Design Commission immediately, so the project can be rescheduled for a formal presentation at the next appropriate public hearing, per standard procedure.

 

Do you need assistance to participate in the meeting? If you need a reasonable accommodation of a disability, such as a sign language interpreter, at the meeting, please inform the Public Design Commission three business days (72 hours) in advance of the meeting. The Public Design Commission conference room is wheelchair accessible.

 

Per Local Law Int 0132-2010, meetings are recorded on digital video and posted online.

 

Public Design Commission
City Hall, Third Floor
Phone: 212-788-3071
Fax: 212-788-3086

www.nyc.gov/designcommission

designcommission@cityhall.nyc.gov


Disclaimer: Pursuant to Section 103 (2) of the New York State General Municipal Law, New York City Charter Section 1066 and the City of New York Procurement Policy Board Rules, The City Record is the official paper of the City of New York. It is published each weekday except legal holidays. The print edition of The City Record is the official publication for the following notices: public hearings, meetings, court notices, property dispositions, procurements (solicitations and awards), agency public hearings, agency rules, and special materials which include changes in personnel. This electronic version of The City Record is offered solely for the convenience of readers.