Accessibility questions:


Design Commission Meeting Agenda
Monday, July 9, 2018
The Committee Meeting is scheduled to begin at 9:30 a.m.
Public Meeting
11:10 a.m. Consent Agenda
26670: Installation of a flue, Kings County Distillery, Building 121, Sands Street between Navy Street and Perry Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn. (Preliminary and Final) (CC 33, CB 2) BNYDC
26671: Installation of signage, Building 399, Sands Street between Navy Street, Third Street, and Chauncey Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn. (Preliminary and Final) (CC 33, CB 2) BNYDC
26672: Installation of a prototypical newsstand, 1328 2nd Avenue, northeast corner of 2nd Avenue and East 70th Street, Manhattan. (Preliminary and Final) (CC 5, CB 8) DCA/DOT
26673: Installation of a prototypical newsstand, 777 7th Avenue, southwest corner of 7th Avenue and West 51st Street, Manhattan. (Preliminary and Final) (CC 4, CB 5) DCA/DOT
26674: Installation of a prototypical newsstand, 945 Southern Boulevard, northwest corner of Southern Boulevard and East 163rd Street, Bronx. (Preliminary and Final) (CC 17, CB 2) DCA/DOT
26675: Installation of a rooftop emergency generator and switchgear, Brooklyn Supreme Court, 360 Adams Street, Brooklyn. (Preliminary and Final) (CC 33, CB 2) DDC
26676: Installation of artwork at the interim trailers, Horizon Juvenile Center, 560 Brooke Avenue, Bronx. (Conceptual) (CC 17, CB 1) DDC/DOC/ACS
26677: Renovation of an animal care center, 323 East 109th Street, Manhattan. (Preliminary) (CC 8, CB 11) DDC/DOHMH
26678: Reconstruction of Queens Boulevard from Roosevelt Avenue to 73rd Street, as Phase I of the reconstruction of Queens Boulevard from Roosevelt Avenue to Union Turnpike, Woodside, Queens. (Preliminary) (CC 26 & 30, CB 2) DDC/DOT
26679: Construction of a prototypical planted median, Grand Concourse Boulevard, Phase IV, from East 175th Street to East Fordham Road, Bronx. (Final) (CC 14 & 15, CB 5) DDC/DOT
26680: Installation of an alarm, Department of Sanitation, Brooklyn 17 Garage, 10502 Avenue D, Brooklyn. (Preliminary and Final) (CB 42, CB 18) DDC/DSNY
26681: Installation of two alarms, Department of Sanitation, Brooklyn 18 Garage, 10501 Foster Avenue, Brooklyn. (Preliminary and Final) (CB 42, CB 18) DDC/DSNY
26682: Installation of windows, 111th Police Precinct, 45-06 215th Street, Flushing, Queens. (Preliminary and Final) (CC 19, CB 11) DDC
26683: Installation of windows, 67th Police Precinct, 2820 Snyder Avenue, Brooklyn. (Preliminary and Final) (CC 40, CB 17) DDC
26684: Installation of windows, 76th Police Precinct, 191 Union Street, Brooklyn. (Preliminary and Final) (CC 39, CB 6) DDC
26685: Installation of windows, NYPD Highway Patrol Precinct No. 3, Cunningham Park, 196-10 Union Turnpike, Fresh Meadows, Queens. (Preliminary and Final) (CC 23, CB 8) DDC/DPR/NYPD
26686: Reconstruction of a retaining wall, installation of rooftop heat cables, and adjacent site work, Riverdale Library, 5540 Mosholu Avenue, Bronx. (Preliminary and Final) (CC 11, CB 8) DDC/NYPL
26687: Installation of a soccer sealcoat field, P.S./I.S. 180, 370 West 120th Street, Manhattan. (Preliminary and Final) (CC 9, CB 10) DOE
26688: Relocation of Untitled (circa 1978) by Ami Shamir, Fashion Institute of Technology, David Dubinsky Student Center, 227 West 27th Street, Manhattan. (Preliminary) (CC 3, CB 5) DOE
26689: Construction of an ADA ramp, 829 9th Avenue, Manhattan. (Preliminary and Final) (CC 3, CB 4) DOT
26690: Construction of a dog run, St. James Park, Jerome Avenue, East 191st Street, Creston Avenue, and East 193rd Street, Bronx. (Preliminary) (CC 14, CB 7) DPR
26691: Construction of a skate park, Harold Ickes Playground, Hamilton Avenue and Van Brunt Street, Brooklyn. (Preliminary) (CC 38 & 39, CB 6) DPR
26692: Construction of athletic fields, including parking areas and adjacent site work, South Park, Freshkills Park, between Arthur Kill Road and West Shore Expressway, Staten Island. (Preliminary) (CC 51, CB 2) DPR
26693: Reconstruction of Harlem Lane Park and Frederick Johnson Park, Adam Clayton Powell Jr. Boulevard, West 150th Street, and Harlem River Drive, Manhattan. (Preliminary) (CC 9, CB 10) DPR
26694: Reconstruction of Luis Lopez Playground and adjacent site work, Targee Street, Palma Drive, and Oder Avenue, Staten Island. (Preliminary) (CC 49, CB 1) DPR
26695: Reconstruction of Ravenswood Playground, 35th Avenue, 21st Street, and 34th Avenue, Astoria, Queens. (Preliminary) (CC 26, CB 1) DPR
26696: Reconstruction of the playground, Thomas Jefferson Park, 1st Avenue between East 111th Street and East 114th Street, Manhattan. (Preliminary) (CC 8, CB 11) DPR
26697: Reconstruction of track 1, soccer fields 3, 4 & 5, and ballfields 1-4 as Phase III of the reconstruction of the Red Hook Recreation Area, Columbia Street and Bay Street, Brooklyn. (Preliminary) (CC 38, CB 6) DPR
26698: Installation of a soccer sealcoat field, Castle Hill Playground, Bronx. (Preliminary and Final) (CC 18, CB 9) DPR
26699: Reconstruction of a staircase, Sakura Park, Claremont Avenue between West 122nd Street and La Salle Street, Manhattan. (Preliminary and Final) (CC 7, CB 9) DPR
26700: Reconstruction of athletic fields as Phase II of the reconstruction of Betsy Head Park, Dumont Avenue, Thomas S. Boyland Street, Livonia Avenue, and Strauss Street, Brooklyn. (Preliminary and Final) (CC 41, CB 16) DPR
26701: Rehabilitation of a comfort station and a utility building, Betsy Head Park, Dumont Avenue, Thomas S. Boyland Street, Livonia Avenue, and Strauss Street, Brooklyn. (Final) (CC 41, CB 16) DPR
26702: Reconstruction of McKinley Playground, adjacent to P.S. 63, Avenue A, East 3rd Street, 1st Avenue, and East 4th Street, Manhattan. (Preliminary and Final) (CC 2, CB 3) DPR
26703: Construction of a segment of the Bronx River Greenway, Shoelace Park, between 211th Street, 229th Street, Bronx Boulevard, and the Bronx River, Bronx. (Final) (CC 12, CB 12) DPR
26704: Construction of a trailhead and parking lot, Arden Heights Woods, Arden Avenue and Arthur Kill Road, Staten Island. (Final) (CC 51, CB 3) DPR
26705: Installation of an artificial turf field and sports lighting, Sternberg Park, Lorimer Street, Montrose Avenue, Leonard Street, and Boerum Street, Brooklyn. (Final) (CC 34, CB 1) DPR
26706: Preservation and adaptive reuse of the West 69th Street Transfer Bridge, Phase II, Riverside South Park, West 69th Street at the Hudson River, Manhattan. (Final) (CC 6, CB 7) DPR
26707: Reconstruction of a playground, McDonald Playground, McDonald Avenue, Avenue S, East 1st Street, and Avenue T, Brooklyn. (Final) (CC 47, CB 15) DPR
26708: Reconstruction of a plaza and playground and adjacent site work, Bensonhurst Park, 21st Avenue, Cropsey Avenue, Bay Parkway, and the Belt Parkway, Brooklyn. (Final) (CC 43, CB 11) DPR
26709: Reconstruction of Bridge Park 2, Jay Street, York Street, Bridge Street, and Prospect Street, Brooklyn. (Final) (CC 33, CB 2) DPR
26710: Reconstruction of Callahan-Kelly Park, Broadway Junction, Van Sinderen Avenue, Truxton Street, Eastern Parkway, and Fulton Street, Brooklyn. (Final) (CC 37, CB 16) DPR
26711: Reconstruction of the playground, Homecrest Playground, East 12th Street, Williams Court, Homecrest Avenue, and Belt Parkway, Brooklyn. (Final) (CC 48, CB 15) DPR
26712: Construction of an electrical substation, Bush Terminal Industrial Campus, 43rd Street and 1st Avenue, Brooklyn. (Preliminary and Final) (CC 38, CB 7) EDC
26713: Reconstruction of the landscape to accommodate citywide ferry service, including installation of a pier, electrical equipment, fencing, access gate, and pathway, Clason Point Park at Bronx River Avenue, Soundview Avenue, East River, Bronx. (Preliminary and Final) (CC 18, CB 9) EDC
Public Hearing
11:15 a.m.
26714: Installation of a distinctive sidewalk, 220 Central Park South, Manhattan. (Preliminary and Final) (CC 6, CB 5) DOT
11:45 a.m.
26715: Relocation of the New York Times Capsule (2000) by Santiago Calatrava, from the entry plaza outside the Columbus Avenue pavilion to the entry plaza outside the Rose Center for Earth & Space, American Museum of Natural History, 81st Street between Columbus Avenue and Central Park West, Manhattan. (Preliminary) (CC 6, CB 7) DCLA/DPR
Design Commission meetings are held in the conference room on the third floor of City Hall, unless otherwise indicated.
All attendees, including members of the public, are encouraged to arrive at least 45 minutes in advance of the estimated time; those who also plan to testify are encouraged to submit their testimony in writing in advance of the meeting date. Please note that all times are approximate and subject to change without notice.
Please note that items on the consent agenda are not presented. If members of the public wish to testify on a consent agenda item, they should contact the Design Commission immediately, so the project can be rescheduled for a formal presentation at the next appropriate public hearing, per standard procedure.
Do you need assistance to participate in the meeting? If you need a reasonable accommodation of a disability, such as a sign language interpreter, at the meeting, please inform the Public Design Commission three business days (72 hours) in advance of the meeting. The Public Design Commission conference room is wheelchair accessible.
Per Local Law Int 0132-2010, meetings are recorded on digital video and posted online.
Public Design Commission
City Hall, Third Floor
Phone: 212-788-3071
Fax: 212-788-3086
designcommission@cityhall.nyc.gov