PIN#BBP 109 Due:
- EXHIBIT 2: Cost Schedules
- ADDENDUM #1
- 4/23/18 Bidder Walkthrough Sign In Sheet
- ADDENDUM #2
- Concrete, Granite and Asphalt Path Repairs Bid RFI Responses
- ADDENDUM #3
- EXHIBIT 12: Water St Crosswalk Paving Details and Specs
- EXHIBIT 6A: MVVA Pier 1 Path Restoration Drawings
- EXHIBIT 6B: MVVA Pier 1 Path Restoration Specifications
- EXHIBIT 7A: Pier 1 Weir Path Electrical As-Built Drawings
- EXHIBIT 7B: Pier 1 Weir Path Lighting Layout
- EXHIBIT 8: Concrete Spall Repair Specs (Pier 3)
- EXHIBIT 9: Concrete Spall Repair Location Plan
- EXHIBIT 10: Pier 6 Pilaster Spall Photographs
- EXHIBIT 11: Water Street Crosswalk Location Plan
- EXHIBIT 1: Draft Contract
- BBP Concrete and Asphalt Path Repair RFP
There will be an optional contractor walk through on Monday April 23, 2018.
Respondents may submit questions and/or request clarification from G and T no later than 3:00pm on April 25, 2018.
Please submit three (3) physical copies of your proposal to Lindsey Ross, Brooklyn Bridge Park, 334 Furman Street, Brooklyn, NY 11201, and one (1) electronic copy sent to lross@bbp.nyc by 4pm on May 9, 2018.
Minority and Women Owned Business Enterprises (M/WBE) are strongly encouraged to apply.