Design Commission Meeting Agenda
Wednesday, January 17, 2018
The Committee Meeting is scheduled to begin at 10:30 a.m.
Public Meeting
12:40 p.m. Consent Items
26446: Installation of a prototypical newsstand, 23 West Broadway, northeast corner of Barclay Street and West Broadway, Manhattan. (Preliminary and Final) (CC 1, CB1) DCA/DOT
26447: Installation of Convergence by Shawn Smith, Westchester Square Branch Library, 9 Westchester Square, Bronx. (Preliminary) (CC 13, CB 10) DCLA%/DDC/NYPL
26448: Installation of rooftop mechanical equipment and replacement of windows, Coney Island Library, 1901 Mermaid Avenue, Brooklyn. (Preliminary and Final) (CC 47, CB 13) DDC
26449: Rehabilitation of entrance and ADA improvements, Sunnyside Community Library, 43-06 Greenpoint Avenue, Queens. (Preliminary and Final) (CC 26, CB 2) DDC
26450: Reconstruction of the recreational yard and installation of rooftop equipment, Crossroads Juvenile Center Site and HVAC upgrades, Brooklyn. (Preliminary and Final) (CC 41, CB 16) DDC/ACS
26451: Restoration of the roof, St. George Branch Library, 5 Central Avenue, Staten Island. (Preliminary and Final) (CC 49, CB 1) DDC/NYPL
26452: Installation of rooftop equipment, Anna M. Kross Center, Buildings 1, 2, 3, 4 & 5, 18-18 Hazen Street, Rikers Island, Bronx. (Preliminary and Final) (CC 22, CB Q1) DOC
26453: Rehabilitation of the East 175th Street Bridge over MetroNorth railroad, Bronx. (Preliminary and Final) (CC 15, CB 6) DOT
26454: Conservation of the Washington Kill Von Kull Monument (1932), Faber Park, Richmond Terrace between Sharpe Avenue and Faber Street, Staten Island. (Preliminary) (CC 49, CB 1) DPR
26455: Construction of a playground and reconstruction of athletic courts, Pulaski Park, Bruckner Boulevard and the Willis Avenue Bridge, Bronx. (Preliminary) (CC 8, CB 1) DPR
26456: Construction of a recreation trail, picnic area, and adult fitness area, Glendale Entrance, Forest Park, Forest Park Drive, Myrtle Avenue, and Jackie Robinson Parkway, Queens. (Preliminary) (CC 30, CB 5) DPR
26457: Reconstruction of a playground, McDonald Playground, McDonald Avenue, Avenue S, East 1st Street, and Avenue T, Brooklyn. (Preliminary) (CC 47, CB 15) DPR
26458: Rehabilitation of Lost Battalion Hall, 93-29 Queens Boulevard, Rego Park, Queens. (Preliminary) (CC 29, CB 6) DPR
26459: Reconstruction of a berm and related site work, Wolfe's Pond Park, between Holton Avenue and Raritan Bay, Staten Island. (Preliminary and Final) (CC 51, CB 3) DPR
26460: Reconstruction of Abraham Lincoln Playground, East 135th Street, between 5th Avenue and Madison Avenue, Manhattan. (Final) (CC 9, CB 11) DPR
26461: Restoration of landscape, including tree plantings, Shore Belt Parkway over Gerritsen Inlet, Brooklyn. (Final) (CC 46, CB 18) DPR/DOT
26462: Installation of a staircase and elevator, and reconstruction of an entrance plaza, including the installation of signage, High Line, West 17th Street, West 18th Street, 10th Avenue, and 11th Avenue, Manhattan. (Final) (CC 3, CB 4) DPR
26463: Construction of two picnic areas and adjacent site work, Prospect Park, East Drive at Parkside Avenue and Lincoln Road, Brooklyn. (Preliminary and Final) (CC 39, CB 6, 7, 8, 9, 12, 14) DPR/PPA
26464: Installation of benches and lightpoles and adjacent site work, Vale of Cashmere and Rose Garden, Prospect Park, Flatbush Avenue between Grand Army Plaza and the Prospect Park Zoo, Brooklyn. (Final) (CC 39, CB 6, 7, 8, 9, 12, 14) DPR/PPA
26465: Construction of a broadcasting facility, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Corona, Queens. (Preliminary and Final) (CC 21, CB 4 & 7) DPR/USTA
26466: Installation of rooftop mechanical equipment, Bronx Terminal Market, 401 Food Center Drive, Bronx. (Preliminary and Final) (CC 17, CB 2) EDC
26467: Construction of a freight rail platform, Hunts Point Terminal Produce Market, 101 Food Center Drive, Bronx. (Final) (CC 17, CB 2) EDC
26468: Installation of Luminescence by Nobuho Nagasawa, The Peninsula, Hunter’s Point South Waterfront Park, 54th Avenue, Center Boulevard, 55th Avenue, and the East River, Long Island City, Queens. (Final) (CC 26, CB 2) EDC/DPR
12:45 pm. Public Hearing
26469: Reconstruction of a portion of Times Plaza, Flatbush Avenue, Atlantic Avenue, and 4th Avenue, Brooklyn. (Preliminary) (CC 39, CB 2) DOT
Design Commission meetings are held in the conference room on the third floor of City Hall, unless otherwise indicated.
All attendees, including members of the public, are encouraged to arrive at least 45 minutes in advance of the estimated time; those who also plan to testify are encouraged to submit their testimony in writing in advance of the meeting date. Please note that all times are approximate and subject to change without notice.
Please note that items on the consent agenda are not presented. If members of the public wish to testify on a consent agenda item, they should contact the Design Commission immediately.
Do you need assistance to participate in the meeting? If you need a reasonable accommodation of a disability, such as a sign language interpreter, at the meeting, please inform the Public Design Commission three business days (72 hours) in advance of the meeting. The Public Design Commission conference room is wheelchair accessible.
Per Local Law Int 0132-2010, meetings are recorded on digital video and posted online.
Public Design Commission
City Hall, Third Floor
Phone: 212-788-3071
Fax: 212-788-3086
designcommission@cityhall.nyc.gov