Monday, October 16, 2017
The Committee Meeting is scheduled to begin at 9:45 a.m.
Public Meeting
11:25 a.m. Consent items
26334: Reconstruction of the courtyard, Building 92, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue between Carlton Avenue and Adelphi Street, Brooklyn. (Preliminary and Final) (CC 33, CB 2) BNYDC
26335: Installation of electrical equipment, fencing, security booth, and turnstile enclosure to accommodate citywide ferry service, Dock 72, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Market Street between 6th Street and Assembly Road, Brooklyn. (Final) (CC 33, CB 2) BNYDC
26336: Installation of a prototypical newsstand, 460 Park Avenue, northwest corner of East 57th Street and Park Avenue, Manhattan. (Preliminary and Final) (CC 4, CB 5) DCA/DOT
26337: Installation of a prototypical newsstand, 520 Park Avenue, northwest corner of 5th Avenue and West 43rd Street, Manhattan. (Preliminary and Final) (CC 4, CB 5) DCA/DOT
26338: Installation of signage, Sherwin Williams Paints, 2333 Cross Bronx Expressway, Bronx. (Preliminary and Final) (CC 18, CB 9) DCAS
26339: Installation of Shapes by Allan McCollum, Elmhurst Community Library, 86-01 Broadway, Queens. (Final) (CC 25, CB 4) DCLA%/DDC/QL
26340: Installation of Unity by Hank Willis Thomas, Tillary Street, between Cadman Plaza East and Adams Street, Brooklyn. (Preliminary) (CC 33, CB 2) DCLA%/DDC/DOT
26341: Conservation of murals by Edwin Howland Blashfield, Kenyon Cox, Joseph Lauber, G.W. Maynard, William Metcalf, Henry Siddons Mowbray, Robert Reid, E. Simmons, Charles Y. Turner, and H. O. Walker, Appellate Courthouse, 35 East 25th Street at Madison Avenue, Manhattan. (Final) (CC 2, CB 5) DDC/DCAS
26342: Repair and replacement of the roof, Main Building, Africa Wing and Tropical Forest Wing, Staten Island Zoo, 614 Broadway, Staten Island. (Preliminary and Final) (CC 49, CB 1) DDC/DCLA/DPR
26343: Construction of the Clearview Pumping Station, Clearview Expressway exit ramp, Roe Place and the Cross Island Parkway service road, Queens. (Final) (CC 19, CB 7) DEP
26344: Installation of green infrastructure including a bioswale, Carroll Park, President Street, Smith Street, Carroll Street, and Court Street, Brooklyn. (Preliminary and Final) (CC 39, CB 6) DEP/DPR
26345: Reconstruction of a portion of Park Slope Playground including green infrastructure, adjacent to P. S. 282, Lincoln Place, 6th Avenue, Berkeley Place, and 5th Avenue, Brooklyn. (Preliminary and Final) (CC 39, CB 6) DEP/DPR
26346: Installation of a distinctive sidewalk, The Paramount Building, 1501 Broadway, 43rd street, between Broadway and 8th Avenue, Manhattan. (Preliminary and Final) (CC 3, CB 5) DOT
26347: Installation of photocells on pedestrian light poles citywide. (Preliminary and Final) DOT
26348: Repainting of the Sackett Street Bridge over the Brooklyn-Queens Expressway, Brooklyn. (Preliminary and Final) (CC 38 & 39, CB 6) DOT
26349: Installation of an artwork by Siah Armajani, North Shore Esplanade, adjacent to the Staten Island Ferry Terminal and former U.S. Coast Guard Light House Depot, Staten Island. (Conceptual) (CC 49, CB 1) DOT/DCLA%
26350: Reconstruction of the 17th Avenue Pedestrian Bridge over the Shore Belt Parkway, Brooklyn. (Final) (CC 47, CB 11) DOT/DPR
26351: Reconstruction of the 27th Avenue Pedestrian Bridge over the Shore Belt Parkway, Brooklyn. (Final) (CC 47, CB 13) DOT/DPR
26352: Construction of a playground, plaza, and adjacent site work, Faber Park, Richmond Terrace between Sharpe Avenue and Faber Street, Staten Island. (Preliminary) (CC 49, CB 1) DPR
26353: Reconstruction of a playground, Rosemary's Playground, Woodward Avenue between Woodbine Street and Madison Street, Ridgewood, Queens. (Preliminary) (CC 30, CB 5) DPR
26354: Reconstruction of the East River Esplanade, East 68th Street to East 70th Street, Manhattan. (Preliminary) (CC 5, CB 8) DPR
26355: Rehabilitation of a comfort station, St. Mary's Park, 450 St. Ann’s Avenue, St. Ann’s Avenue at East 145th Street, Bronx. (Preliminary) (CC 8, CB 1) DPR
26356: Installation of gas line, meter and piping, Operations Office, Sara D. Roosevelt Park, 263 Grand Street, between Chrystie Street, Forsyth Street, and Delancey Street, Manhattan. (Preliminary and Final) (CC 1, CB 3) DPR
26357: Reconstruction of docks, Mill Basin Marina, East 69th Street and Avenue Y, Brooklyn. (Preliminary and Final) (CC 46, CB 18) DPR
26358: Construction of an adult fitness area and adjacent site work, Bronx Park, Bronx Park East and Allerton Avenue, Bronx. (Final) (CC 15, CB 11) DPR
26359: Installation of an ADA ramp at the comfort station, Sara D. Roosevelt Park, Stanton Street between Chrystie Street and Forsyth Street, Manhattan. (Final) (CC 1, CB 3) DPR
26360: Reconstruction of Almeda Playground, adjacent to P.S. 42, Beach Channel Drive between Beach 65th Street and Beach 66th Street, Arverne, Queens. (Final) (CC 31, CB 14) DPR
26361: Reconstruction of athletic courts and installation of an artificial turf field, General Douglas MacArthur Park, Dongan Hills Avenue and Jefferson Street, Staten Island. (Final) (CC 50, CB 1) DPR
26362: Reconstruction of athletic fields and adjacent site work as Phase I of the reconstruction of Astoria Park, Astoria Park South, 21st Street, and Shore Boulevard, Astoria, Queens. (Final) (CC 22, CB 1) DPR
26363: Reconstruction of basketball courts, Nostrand Playground, adjacent to P.S. 269, Nostrand Avenue and Foster Avenue, Brooklyn. (Final) (CC 45, CB 17) DPR
26364: Reconstruction of Fairview Park, Phase II, including the construction of a prototypical comfort station, Fairview Park, Englewood Avenue, Arthur Kill Road, Veterans Road West, and Bricktown Way, Staten Island. (Final) (CC 50, CB 3) DPR
26365: Reconstruction of Garrison Playground, East 146th Street, Walton Avenue, and the Grand Concourse, Bronx. (Final) (CC 17, CB 1) DPR
26366: Reconstruction of Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria, Queens. (Final) (CC 22, CB 1) DPR
26367: Reconstruction of Weeksville Playground, Howard Avenue between Atlantic Avenue and Herkimer Street, Brooklyn. (Final) (CC 41, CB 3) DPR
26368: Rehabilitation of a comfort station, Abraham Lincoln Playground, East 135th Street between 5th Avenue and Madison Avenue, Manhattan. (Final) (CC 9, CB 11) DPR
26369: Rehabilitation of a comfort station, Playground 174 (formerly Bronx River Houses Playground), East 174th Street between Ward Avenue and Manor Avenue, Bronx. (Final) (CC 8, CB 1) DPR
26370: Installation of structural support beams, High Line Maintenance and Operations facility, Gansevoort Street and Washington Street, Manhattan. (Preliminary and Final) (CC 3, CB 4) DPR/FHL
26371: Installation of two distance markers, Astoria Park, Astoria, Queens. (Preliminary and Final) (CC 22, CB 1) DPR
26372: Installation of a pre-fabricated storage building, Prospect Park, Prospect Park West between Sixth Street and Eighth Street, Brooklyn. (Final) (CC 39, CB 6, 7, 8, 9, 12 & 14) DPR/PPA
26373: Reconstruction of a picnic area, Prospect Park Picnic House, Prospect Park West and Fifth Street, Brooklyn. (Final) (CC 39, CB 6, 7, 8, 9, 12 & 14) DPR/PPA
26374: Reconstruction of the picnic areas and adjacent site work, Prospect Park Bandshell, Prospect Park West between 9th Street and 11th Street, Brooklyn. (Final) (CC 39, CB 6, 7, 8, 9, 12 & 14) DPR/PPA
26375: Installation of a roof, Manhattan Borough Repair Shop, 636 West 26th Street, Manhattan. (Preliminary and Final) (CC 3, CB 4) DSNY
Public Hearing
11:30 a.m.
26376: Construction of a plaza and adjacent site work, Newtown Playground, 56th Avenue and 92nd Street, Elmhurst, Queens.(Preliminary and Final) (CC 25, CB 4) DPR
Design Commission meetings are held in the conference room on the third floor of City Hall, unless otherwise indicated.
All attendees, including members of the public, are encouraged to arrive at least 45 minutes in advance of the estimated time; those who also plan to testify are encouraged to submit their testimony in writing in advance of the meeting date. Please note that all times are approximate and subject to change without notice.
Please note that items on the consent agenda are not presented. If members of the public wish to testify on a consent agenda item, they should contact the Design Commission immediately, so the project can be rescheduled for a formal presentation at the next appropriate public hearing, per standard procedure.
Do you need assistance to participate in the meeting? If you need a reasonable accommodation of a disability, such as a sign language interpreter, at the meeting, please inform the Public Design Commission three business days (72 hours) in advance of the meeting. The Public Design Commission conference room is wheelchair accessible.
Per Local Law Int 0132-2010, meetings are recorded on digital video and posted online.
Public Design Commission
City Hall, Third Floor
Phone: 212-788-3071
Fax: 212-788-3086
designcommission@cityhall.nyc.gov