You are using an UNSUPPORTED version of browser, please try to update your browser.

Title: Design Commission Meeting Agenda, Monday, April 24, 2017
Public Hearings and Meetings
Public Design Commission (PDC)
4/24/2017

Accessibility questions:

Wheelchair Accessible Sign Language Interpretation
Archived
4/20/2017
Meeting
Description

Meeting Agenda

Monday, April 24, 2017

 

The Committee Meeting is scheduled to begin at 10:25 a.m.

 

Public Meeting

 

1:00 p.m.         Consent Items

 

26093:             Reconstruction of the Greenpoint Branch Library and Environmental Education Center, 107 Norman Avenue, Brooklyn. (Final) (CC 33, CB 1) BPL

 

26094:             Installation of a prototypical newsstand, 2182 Broadway, southeast corner of Broadway and West 78th Street, Manhattan. (Preliminary and Final) (CC 6, CB 7) DCA/DOT

 

26095:             Installation of a prototypical newsstand, 910 8th Avenue, northeast corner of 8th Avenue and West 54th Street, Manhattan. (Preliminary and Final) (CC 3, CB 5) DCA/DOT

 

26096:             Restoration of windows on a portion of the east elevation, Heckscher Building, 1230 Fifth Avenue, Manhattan. (Preliminary and Final) (CC 8, CB 11) DCAS

 

26097:             Construction of an NYPD Bomb Squad building, 100A Rodman Neck Path, Pelham Bay Park, Bronx. (Final) (CC 13, CB 10) DDC/NYPD

 

26098:             Installation of coping, New Dorp Branch Library, 309 Dorp Lane, Staten Island. (Preliminary and Final) (CC 50, CB 2)  DDC/NYPL

 

26099:             Construction of a biogas conditioning system and adjacent site work, Newtown Creek Water Pollution Control Plant, 329 Greenpoint Avenue, Brooklyn. (Preliminary) (CC 33, CB 1) DEP

 

26100:             Installation of a prototypical neighborhood wayfinding sign, Richmond Terrace, Staten Island. (Preliminary and Final) (CC 49, CB 1) DOT

 

26101:             Installation of M-pole lighting, Myrtle Avenue from 80th Street to Woodhaven Boulevard, Ridgewood, Queens. (Preliminary and Final) (CC 30, CB 5) DOT

 

26102:             Construction of a healing garden, Kissena Corridor Park, Main Street and 56th Avenue, Flushing, Queens. (Preliminary) (CC 20, CB 7) DPR

 

26103:             Construction of a park, including a storage shed, West 20th Street between 6th Avenue and 7th Avenue, Manhattan. (Preliminary) (CC 3, CB 4) DPR

 

26104:             Installation of an ADA ramp, Brooklyn War Memorial, Cadman Plaza, Tillary Street, Fulton Street, Prospect Street, and Washington Street, Brooklyn. (Preliminary) (CC 33, CB 2) DPR

 

26105:             Installation of an ADA ramp, Sara D. Roosevelt Park, Stanton Street between Chrystie Street and Forsyth Street, Manhattan. (Preliminary) (CC 1, CB 3) DPR

 

26106:             Reconstruction of athletic fields and adjacent site work as Phase I of the reconstruction of Astoria Park, Astoria Park South, 21st Street, and Shore Boulevard, Astoria, Queens. (Preliminary) (CC 22, CB 1) DPR

 

26107:             Reconstruction of ballfields, a dog run, and promenade as Phase I of the reconstruction of St. Mary’s Park, Jackson Avenue and East 143st Street, Bronx. (Preliminary) (CC 8, CB 1) DPR

 

26108:             Reconstruction of Garrison Playground, East 146th Street, Walton Avenue, and the Grand Concourse, Bronx. (Preliminary) (CC 17, CB 1) DPR

 

26109:             Reconstruction of Jacob Joffe Park, Avenue K, East 58th Street, Avenue L, and East 59th Street, Brooklyn. (Preliminary) (CC 46, CB 18) DPR

 

26110:             Reconstruction of the Reflecting Pool as Phase I of the reconstruction of three fountains, between the Unisphere and Fountain of the Planets, Flushing Meadows Corona Park, Corona, Queens. (Preliminary) (CC 21, CB 4) DPR

 

26111:             Reconstruction of Weeksville Playground, Howard Avenue between Atlantic Avenue and Herkimer Street, Brooklyn. (Preliminary) (CC 41, CB 3) DPR

 

26112:             Rehabilitation of the Grand Staircase and pathways, and construction of a plaza as Phase I of the reconstruction of Highbridge Park, Laurel Hill Terrace between Amsterdam Avenue and Harlem River Drive and Dyckman Street and Harlem River Drive, Manhattan. (Preliminary) (CC 10, CB 12) DPR

 

26113:             Construction of an administration and education building (The Cubes), Socrates Sculpture Park, Vernon Boulevard, Broadway, and 31st Road, Long Island City, Queens. (Preliminary and Final) (CC 26, CB 1) DPR

 

26114:             Installation of a sealcoat soccer field, P.S. 83, 219 East 109th Street, Manhattan. (Preliminary and Final) (CC 8, CB 11) DOE

 

26115:             Installation of a sealcoat soccer field, Frederick Johnson Park, 7th Avenue between West 150th and West 151st Street, Manhattan. (Preliminary and Final) (CC 9, CB 10) DPR

 

26116:             Reconstruction of a playground and athletic courts, Dutch Kills Playground, Crescent Street and 36th Avenue, Long Island City, Queens. (Final) (CC 26, CB 1) DPR

 

26117:             Reconstruction of ballfields, Cypress Hills Park, Euclid Avenue between Dumont Avenue and Blake Avenue, Brooklyn. (Final) (CC 42, CB 5) DPR

 

26118:             Reconstruction of Fairview Park, Phase I, Englewood Avenue, Arthur Kill Road, Veterans Road West, and Bricktown Way, Staten Island. (Final) (CC 50, CB 3) DPR

 

26119:             Reconstruction of Lafayette Playground, Lafayette Avenue between Malcom X Boulevard and Patchen Avenue, Brooklyn. (Final) (CC 47, CB 13) DPR

 

26120:             Reconstruction of Lawrence Playground, College Point Boulevard, Botanical Garden Bridge, and the Van Wyck Expressway, Queens. (Final) (CC 20, CB 7) DPR

 

26121:             Reconstruction of Playground 123, Phase II, Morningside Park, West 123rd Street and Morningside Avenue, Manhattan. (Final) (CC 9, CB 9) DPR

 

26122:             Reconstruction of the Riverside Skate Park, Riverside Park and West 108th Street, Manhattan. (Final) (CC 6, CB 7) DPR

 

26123:             Rehabilitation of a comfort station, Corlears Hook Park, Cherry Street, Jackson Street, and the FDR Drive, Manhattan. (Final) (CC 2, CB 3) DPR

 

26124:             Rehabilitation of a comfort station, Dutch Kills Playground, Crescent Street and 36th Ave, Long Island City, Queens. (Final) (CC 26, CB 1) DPR

 

26125:             Conservation of King Jagiello (1939) by Stanislaw Kazimierz Ostrowski, Central Park, north of the 79th Street transverse, Manhattan. (Final) (CC 9, CB 5, 7, 8, 10 & 11) DPR/CPC

 

26126:             Construction of a truck weigh station, compost structures, and adjacent site work, 450 West Service Road, Staten Island. (Preliminary and Final) (CC 50, CB 3) DSNY

 

26127:             Rehabilitation of La Marqueta and La Placita, Park Avenue between East 114th Street and East 116th Street, Manhattan. (Preliminary) (CC 9, CB 11) EDC

 

26128:             Construction of a concrete facility (Ferrara Brothers), 730 3rd Avenue between 24th Street, 25th Street, and the Gowanus Canal, Brooklyn. (Final) (CC 38, CB 7) EDC

 

26129:             Reconstruction of the landscape to accommodate citywide ferry service, including the installation of electrical equipment, fencing and access gate, Pier 6, Brooklyn Bridge Park. (Preliminary and Final) (CC 33, CB 2) EDC/BBP

 

 

Design Commission meetings are held in the conference room on the third floor of City Hall, unless otherwise indicated.

 

All attendees, including members of the public, are encouraged to arrive at least 45 minutes in advance of the estimated time; those who also plan to testify are encouraged to submit their testimony in writing in advance of the meeting date. Please note that all times are approximate and subject to change without notice.

              

Please note that items on the consent agenda are not presented. If members of the public wish to testify on a consent agenda item, they should contact the Design Commission immediately, so the project can be rescheduled for a formal presentation at the next appropriate public hearing, per standard procedure.

 

Do you need assistance to participate in the meeting? If you need a reasonable accommodation of a disability, such as a sign language interpreter, at the meeting, please inform the Public Design Commission three business days (72 hours) in advance of the meeting. The Public Design Commission conference room is wheelchair accessible.

 

Per Local Law Int 0132-2010, meetings are recorded on digital video and posted online.

 

Public Design Commission
City Hall, Third Floor
Phone: 212-788-3071
Fax: 212-788-3086

www.nyc.gov/designcommission

designcommission@cityhall.nyc.gov


Disclaimer: Pursuant to Section 103 (2) of the New York State General Municipal Law, New York City Charter Section 1066 and the City of New York Procurement Policy Board Rules, The City Record is the official paper of the City of New York. It is published each weekday except legal holidays. The print edition of The City Record is the official publication for the following notices: public hearings, meetings, court notices, property dispositions, procurements (solicitations and awards), agency public hearings, agency rules, and special materials which include changes in personnel. This electronic version of The City Record is offered solely for the convenience of readers.