CORRECTION: Contract Number: COS-E001, Document Fee: $80, Project Manager: Manuel Florin, MFlorin@dep.nyc.gov. There will be a pre-bid meeting on 1/17/2017 located at Croton Water Filtration Plant, 3701 Jerome Ave, Bronx, NY 10467 at 9:00AM. PPE and Temporary Access form required for site, car entrance at E 213 St. Jerome Ave to park, ask for ARB (Arrival Receiving Building).