phone: 7187246435
fax: 7182229258
email: lross@bbpnyc.org
PIN#81313-12 Due:
- Pier 3 RFP Walk Through Sign-In Sheet
- BBP Pier 3 RFP Addendum #1
- BBP Pier 3 RFI Responses
- Exhibit 1: Contract Draft
- Exhibit 4: Doing Business Data Form
- Exhibit 7: Limited Asbestos and Lead Paint Inspection Report
- Exhibit 8: Pier 3 Asbestos Inspection Report
- BBP P3 Landscape RFP
- Exhibit 2: Cost Schedule
- Lead Paint Handling Specifications
- Exhibit 6: Specifications
- Exhibit 6: Drawings Part 1 of 2
- Exhibit 6: Drawings Part 2 of 2
- BBP Pier 3 RFP Addendum #3
- BBP Pier 3 RFP Addendum #2
This RFP pertains to the construction of the Pier 3 landscape. The Pier 3 site includes the creation of new lawns, planting beds, a hedge labyrinth, and a large hardscape area. The Pier 3 project includes the conversion of an existing pier previously used for warehousing into a landscaped area for the Park. The Pier`s primary feature is a sunken central lawn surrounded by plantings. A hedge labyrinth will be featured on the northern edge of the pier, and the western edge will remain pier deck for a large hardscape area.